Review turnkey mineral processing and gold recovery plant installations engineered by Zhongxin Heavy. Detailed case studies cover gold CIP/CIL cyanidation lines, copper ore flotation circuits, iron ore magnetic separation, and gravity concentration systems—complete with process flowsheets, equipment configurations, and verified mineral recovery rates.
Zhongxin Heavy Industry engineers and supplies turnkey 100–300 TPH iron ore beneficiation plants in Odisha, India, specifically designed to upgrade low-grade hematite, goethite, and banded hematite quartzite (BHQ) ores into high-grade pelletizing and sinter feed. Integrating heavy-duty XL series spiral washing and desliming, closed-circuit ball milling, wet high-intensity magnetic separation (WHIMS), and zero-liquid-discharge (ZLD) tailings dewatering, the plant reliably boosts iron content from 48%–54% Fe up to 63.5%–65.5% Fe while sharply reducing silica (SiO2) and alumina (Al2O3) impurities.
Target Region: Barbil, Joda & Keonjhar Iron Ore Belts, Odisha, India
Raw Material: Low-Grade Hematite, Lateritic Iron Ore & Clay-Bearing Iron Ore Fines (48%–54% Fe)
Processing Capacity: 100–300 TPH (Modular Scalable Configuration)
Core Beneficiation Flow: Spiral Washing & Desliming → Ball Mill Grinding → Low & High-Intensity Magnetic Separation (LIMS + WHIMS) → Thickening & Filter Press Dewatering
Final Concentrate Grade: 63.5%–65.5% Fe (Al2O3 < 2.2%, SiO2 < 3.0%)
Manufacturer: Zhongxin Heavy Industry
Project Background & Beneficiation Challenges in Odisha, India
As high-grade direct-shipping iron ore reserves deplete across Odisha, Jharkhand, and Chhattisgarh, Indian steelmakers and merchant miners increasingly rely on low-grade iron ore fines and overburden dumps. However, raw ore in eastern India poses three major operational challenges:
◎High Clay & Alumina Content: Sticky lateritic clay coats iron oxide particles, blinding screens and raising alumina levels above blast furnace and pellet plant tolerances—especially during India's heavy monsoon season.
◎Fine Dissemination Size: Weakly magnetic hematite and martite require controlled grinding (typically 80% passing 200 mesh / 74 microns) to liberate iron minerals from quartz gangue without over-grinding into slimes.
◎Strict Water & Environmental Norms: Indian State Pollution Control Boards (SPCB) mandate closed-loop water recycling and dry-stack tailings management to prevent tailings pond seepage.
To address these requirements, Zhongxin Heavy Industry developed a modular 100–300 TPH wet iron ore beneficiation flowsheet engineered for high iron recovery (82%–88%), low reagent/power consumption, and >85% process water recirculation.
Stage 1: Heavy-Duty Spiral Washing & Desliming
Crushed iron ore fines (≤ 10 mm, supplied from an upstream primary/secondary crushing circuit) enter a 2XL1115 Twin-Shaft Spiral Ore Washer followed by a Linear Dewatering & Washing Screen fitted with high-pressure spray nozzles. Through continuous spiral blade agitation (18 r/min) and counter-current water flushing, sticky clay and ultra-fine alumina slimes (-0.074 mm primary slimes) are thoroughly scrubbed and overflowed away, recovering clean coarse iron fractions (+3 mm) directly as high-grade sinter feed.
Stage 2: Closed-Circuit Grinding & Classification
The intermediate fraction (-3 mm) is pumped to a Wet Overflow Ball Mill operating in a closed circuit with a High-Weir Spiral Classifier and Hydrocyclone Cluster. This two-stage classification ensures precise particle liberation at -200 mesh (0.074 mm) while preventing over-grinding, preparing uniform slurry pulp density for magnetic separation.
Stage 3: Two-Stage Magnetic Separation (LIMS + WHIMS)
Roughing (LIMS): Ground slurry first passes through a Wet Drum Low-Intensity Magnetic Separator to capture strongly magnetic magnetite and maghemite minerals at low magnetic field strength (1,500–2,500 Gauss).
Scavenging & Cleaning (WHIMS): Non-magnetic tailings from LIMS are fed into a Vertical Ring Wet High-Intensity Magnetic Separator (WHIMS) operating at 10,000–14,000 Gauss to recover weakly magnetic hematite and limonite, maximizing overall iron unit recovery.
Stage 4: Concentrate Dewatering & Tailings Dry Stacking (ZLD)
Final iron ore concentrate is dewatered via a Concentrate Thickener and Vacuum Disc Filter, yielding filter cake with <10% moisture ready for pelletizing plants. Beneficiation tailings are routed to a High-Rate Tailings Thickener and Automatic Chamber Filter Press, recovering over 85% of process water for continuous plant reuse while producing stackable dry tailings cake.
Main Equipment Configuration List (200 TPH Reference Line)
| Process Stage | Equipment Name | Model / Specification | Qty | Power (kW) | Operational Function & Highlights |
| 1. Washing & Desliming | XL Series Spiral Ore Washer | 2XL1115 (200–250 TPH, ≤10 mm feed) | 1 | 2×15 | Twin-screw clay scrubbing and counter-current desliming |
| 2. Desliming Screen | Linear Dewatering & Washing Screen | ZKR2460 | 2 | 2×18.5 | High-pressure spray bars remove alumina slimes |
| 3. Grinding | Wet Overflow Ball Mill | MQY3245 | 1 | 630 | Rubber/alloy liners; grinds feed to 80% -74 μm |
| 4. Classification | Spiral Classifier & Hydrocyclone | 2FG-2400 / FX350×6 | 1 set | 22 | Closed-circuit size control; prevents over-grinding |
| 5. Rough Magnetic Sep. | Wet Drum Magnetic Separator | CTB1230 | 2 | 2×5.5 | Recovers strongly magnetic iron minerals efficiently |
| 6. High-Intensity Sep. | Vertical Ring WHIMS Separator | SLon-2000 | 2 | 2×45 | 12,000+ Gauss pulsating magnetic field for fine hematite |
| 7. Concentrate Filter | Vacuum Disc Filter | GP-60 | 1 | 55 | Reduces concentrate cake moisture below 10% |
| 8. Water & Tailings | High-Rate Thickener & Filter Press | NZ-24 / XMZ500 | 1 set | 65 | >85% closed-loop water recycling; dry tailings stacking |
Significant Alumina & Silica Reduction: Intense counter-current agitation in the 2XL1115 spiral ore washer combined with hydrocyclone desliming cuts Al2O3 from 5%–8% down to <2.2%, improving blast furnace productivity and reducing coke rates.
High Recovery of Weakly Magnetic Hematite: Vertical ring WHIMS technology with pulsating slurry agitation prevents magnetic matrix clogging and captures fine hematite particles down to 20 microns.
Monsoon-Proof & Slurry-Tolerant Design: Heavy-duty slurry pumps lined with high-chrome alloy (Cr27) and wear-resistant rubber chutes handle abrasive, high-clay feeds continuously throughout Odisha's monsoon months.
Complete Zero Liquid Discharge (ZLD) Compliance: High-rate thickeners and automatic filter presses eliminate open tailings ponds, meeting strict Indian environmental regulations while cutting fresh makeup water demand by up to 85%.
Optimize your mineral beneficiation circuit with our high-recovery mineral processing equipment. We manufacture heavy-duty grinding ball mills, spiral classifiers, hydrocyclones, froth flotation machines, and magnetic separators designed for processing gold, copper, iron, and manganese ores. Engineered for continuous duty and maximum mineral extraction efficiency, our machinery ensures reduced wear, lower power consumption, and improved concentrate grades across all hard-rock mining operations.
Discover custom-engineered mineral processing lines and complete aggregate production plant solutions tailored to your capacity and ore characteristics. From turnkey gold ore processing plants (CIP/CIL & flotation) and copper extraction lines to high-capacity sand-making and aggregate crushing circuits, we provide end-to-end flowsheets—integrating crushing, wet grinding, classification, and slurry dewatering. Partner with us for optimized plant layout design, factory-direct equipment supply, and maximum ROI.
This section is designed to address the most pressing inquiries customers may have regarding the daily operation, maintenance, product advantages, and after-sales service of our cone crushers. Our aim is to help you gain a comprehensive understanding of our overall capabilities and enable you to make informed decisions for your projects.
Choosing Zhongxin genuine wear parts reduces downtime and significantly boosts your mining operation's ROI.
Before finalizing equipment selection, our metallurgical laboratory conducts comprehensive chemical assay, Bond Work Index (grinding), spiral washing, and Davis Tube / WHIMS magnetic separation tests on your actual Indian ore sample. Based on verified recovery curves, we deliver tailored P&ID flowsheets, 3D plant layouts, and civil foundation drawings.
Zhongxin Heavy Industry dispatches senior mechanical, electrical, and mineral processing engineers to your site in Odisha, Jharkhand, or Karnataka to supervise equipment erection, slurry piping, PLC automation, and load commissioning. Our metallurgists fine-tune pulp density, magnetic field intensity, and cyclone pressure until target >63.5% Fe concentrate grade is stably achieved.
Wet iron ore processing demands reliable wear components. We maintain factory stock of wear-resistant spiral washer blades, high-chrome Cr27 slurry pump impellers and liners, polyurethane hydrocyclone apexes, ball mill liners, magnetic separator drums, and filter press cloths, ensuring rapid dispatch to Indian ports and minimal unplanned downtime.