Home > News > Company News

How to reduce the failure rate of cone crusher

Time: 2021-01-22 10:21:50 Share To
If you are looking for related products or have any other questions, do not hesitate to call our sales line or click on the right button to request a quote online. Phone:+0086-371-67660555, Whatsapp/Wechat:+0086-13676922906, Email:sales@zxcrusher.com
 The structure of the cone crusher is very complex. It is composed of many accessories and parts. Because the cone crusher works in harsh environments for a long time, the parts that make up the cone crusher will soon have problems such as wear and fracture, which are serious It will cause the entire cone crusher system to be paralyzed and can only wait for professional maintenance personnel to repair it. This will delay time and increase production costs. Therefore, it is necessary to reduce the failure rate of cone crushers. So how to reduce the failure rate of these cone crushers? Jiaozuo Zhongxin believes that prevention is *, maintenance is the * priority, and maintenance is the bottom.


 cone crusher
 
 1. Maintenance is as follows: the need for maintenance indicates that the cone crusher has failed. When the cone crusher fails, the maintenance will definitely s* production, and the original production plan needs to be broken. This situation is undoubtedly passive. We do not I know when the cone crusher will fail, and I don’t know what kind of failure the cone crusher will have. There is a kind of attitude of soldiers coming to cover, and we must know that these are all measures taken when there is no way to control it. If the crusher fails, it is very likely that we did not find out the problem in time, causing the problematic parts to work with illnesses. Could we check it out before the failure occurred?
 
2. Maintenance *: every part of the cone crusher plays a vital role when it is working, from the crushing wall and the rolling mortar wall to the bolts, nuts and gaskets. Each part is in the design All have their meanings. At the same time, due to the working nature of the cone crusher, every part must be maintained after a long period of work, especially some important parts, if the parts that are subject to relatively large stress for a long time are not available Effective maintenance, timely lubrication, a long time, the performance declines sharply, so the cone crusher is prone to failure. Timely maintenance and proper maintenance can greatly reduce the failure rate of the cone crusher, and maintenance is easier than repair to prevent failure.
 
3. Prevention *: We often emphasize that daily maintenance and repair are not unreasonable. Effective maintenance and regular maintenance are actually troubleshooting faults. The daily maintenance of cone crushers is to find out whether the parts are damaged or damaged. Has the degree reached the point where it needs to be replaced, so that the user can make a correct judgment, so that the cone crusher has been replaced before the failure has started.

Contact Form

Email: sales@zxcrusher.com, Phone:0086-371-67660555, Whatsapp/Wechat:+86-13676922906

Leave your needs, Our sales manager will contact with you as soon as possible.

Message

Leave your needs, Our sales manager will contact with you as soon as possible.

  • Name:
  • *E-mail:
  • Tel / Whatsapp:
  • Country:
  • Your Message:

Contact Us

E-mail:sales@zxcrusher.com   TEL:0086-371-67660555
Whatsapp/Wechat:+86-13676922906

Our Website

Chinese website:www.jzzxzg.com

English website:www.zxcrusher.com

España:www.zxcrusher.es   Русский:www.zxcrusher.ru

SNS Site Links:

  • whatsapp
  • skype
  • facebook
  • youtube
  • linkedin
  • twiter
  • blogspot