Discover high-efficiency Gold Ore Processing Plant systems engineered for optimal recovery and continuous heavy-duty operation. From gold ore crushing and fine grinding to flotation and CIL/CIP extraction, we provide end-to-end processing lines customized to your ore characteristics and daily capacity requirements. Benefit from low energy consumption, durable components, and direct factory pricing.
Streamline your mining operation with our turnkey 100 TPD CIL/CIP gold processing plant. Manufactured by Zhongxin Heavy Industrial, this full-process system integrates primary crushing, wet ball grinding, high-recovery carbon-in-leach adsorption, and on-site gold bullion refining—engineered for maximum efficiency and low operational costs in regional mining environments.
For small-to-medium-sized gold mining projects processing primary quartz vein ore or tailings in Zimbabwe, the Carbon-in-Leach (CIL) process offers the highest ROI. Compared to traditional Carbon-in-Pulp (CIP), CIL combines cyanide leaching and carbon adsorption within the same tanks. This reduces total footprint and equipment requirements by $15\% - 20\%$ while effectively mitigating the "preg-robbing" effect commonly found in carbonaceous ores.
Zhongxin Heavy Industrial provides complete one-stop EPC delivery, supporting custom flowsheet design, equipment manufacturing, field installation, and metallurgical process optimization.
Technical Configuration & Process Flowchart
Raw Ore Bin ➔ Vibrating Feeder (GZD-800x2500) ➔ Primary Jaw Crusher (PE400x600) ➔ Fine Jaw Crusher (PEX250x1000)
➔ Wet Ball Mill (Φ2.1x3.6m) ➔ Spiral Classifier (FG-15) ➔ Slurry Agitation Tank (Φ2.0x2.5m)
➔ 6-8 Series CIL Leaching & Adsorption Tanks ➔ Desorption & Electrowinning ➔ Smelting Furnace (Doré Gold Bars)
➔ Tailings Thickener (NZS-6) ➔ Water Recycled
| Circuit Section | Equipment Name | Model / Specification | Qty | Power (kW) | Operational Remarks |
| 1. Crushing Circuit | Vibrating Feeder | ZSWT600×200 | 1 | 2 * 1.5 | Includes grizzly bar pre-screening |
| Primary Jaw Crusher | PE400×600 | 1 | 30 | Feed ≤340 mm; Discharge 40-100mm | |
| Fine Jaw Crusher | PEX250×1000 | 1 | 30 | Discharge 15-50mm | |
| Belt Conveyor | B500 / B650 | 3-4 | — | Inter-stage material transit | |
| 2. Grinding & Classifying | Overflow Ball Mill | 2.1× 3.6m | 1 | 210 | Effective vol:- 10.5m3; Media charge: -19 t |
| Spiral Classifier | FG-15 (1500) | 1 | 7.5 | Overflow fineness: 70-85% passing -200 mesh | |
| 3. Leaching & Adsorption | Slurry Agitation Tank | 2.0×2.5 m | 1 | 5.5 | Slurry conditioning & reagent mixing |
| CIL Leaching Tank | 3.5 × 3.5m | 6–8 | 7.5× (6-8) | Dual-impeller agitation; Leaching + Adsorption | |
| Carbon-Slurry Screen | Linear Vibrating | 2 | 2.2 | Retains carbon particles during transfer | |
| Reagent Dosing System | Metered Skid | 1 | — | Dosing for NaCN, Lime, & Activated Carbon | |
| 4. Desorption & Smelting | Desorption & Electrowinning | Custom System | 1 | ~ 50 | Includes desorption column, cell, & heater |
| Smelting Furnace | Medium-Frequency | 1 | 15 | Smelts gold sludge into gold doré bars | |
| Tailings Thickener | NZS6 ( 6m) | 1 |
Optimize your mineral beneficiation circuit with our high-recovery mineral processing equipment. We manufacture heavy-duty grinding ball mills, spiral classifiers, hydrocyclones, froth flotation machines, and magnetic separators designed for processing gold, copper, iron, and manganese ores. Engineered for continuous duty and maximum mineral extraction efficiency, our machinery ensures reduced wear, lower power consumption, and improved concentrate grades across all hard-rock mining operations.
Discover custom-engineered mineral processing lines and complete aggregate production plant solutions tailored to your capacity and ore characteristics. From turnkey gold ore processing plants (CIP/CIL & flotation) and copper extraction lines to high-capacity sand-making and aggregate crushing circuits, we provide end-to-end flowsheets—integrating crushing, wet grinding, classification, and slurry dewatering. Partner with us for optimized plant layout design, factory-direct equipment supply, and maximum ROI.
This section is designed to address the most pressing inquiries customers may have regarding the daily operation, maintenance, product advantages, and after-sales service of our cone crushers. Our aim is to help you gain a comprehensive understanding of our overall capabilities and enable you to make informed decisions for your projects.
Choosing Zhongxin genuine wear parts reduces downtime and significantly boosts your mining operation's ROI.
We help clients develop maintenance plans to solve issues before wear affects production.
We offer customized parts for materials like granite or gold ore, increasing wear resistance by 30%.
Leveraging our optimized supply chain, we promise the fastest delivery of parts to global sites.